Phthalic anhydride CAS 85-44-9
Paris: UNEP publications, 2005. - 213 p.SIDS Initial Assessment Report For SIAM 20:
Deadline for circulation: 21 January 2005OECD/ICCA - The BUA Peer Review Process
Qualified BUA personnel (toxicologists, ecotoxicologists) perform a quality control on the full SIDS dossier submitted by industry. This quality control process follows internal BUA guidelines/instructions for the OECD/ICCA peer review process and includes:
– a full (or update) literature search to verify completeness of data provided by industry in the IUCLID/HEDSET
– Review of data and assessment of the quality of data
– Review of data evaluation
– Check of adequacy of selection process for key studies for OECD endpoints, and, where relevant, for non-OECD endpoints by checking original reports/publications
– Review of key study description according robust summaries requirements; completeness and correctness is checked against original reports/publications (if original reports are missing: reliability (4), i.e. reliability not assignable)
– Review of validity of structure-activity relationships
– Review of full SIDS dossier (including SIAR, SIAP and proposal for conclusion and recommendation for further work)
– In case of data gaps, review of testing plan or rationale for not testing.
Deadline for circulation: 21 January 2005OECD/ICCA - The BUA Peer Review Process
Qualified BUA personnel (toxicologists, ecotoxicologists) perform a quality control on the full SIDS dossier submitted by industry. This quality control process follows internal BUA guidelines/instructions for the OECD/ICCA peer review process and includes:
– a full (or update) literature search to verify completeness of data provided by industry in the IUCLID/HEDSET
– Review of data and assessment of the quality of data
– Review of data evaluation
– Check of adequacy of selection process for key studies for OECD endpoints, and, where relevant, for non-OECD endpoints by checking original reports/publications
– Review of key study description according robust summaries requirements; completeness and correctness is checked against original reports/publications (if original reports are missing: reliability (4), i.e. reliability not assignable)
– Review of validity of structure-activity relationships
– Review of full SIDS dossier (including SIAR, SIAP and proposal for conclusion and recommendation for further work)
– In case of data gaps, review of testing plan or rationale for not testing.
Categorie:
Lingua:
english
File:
PDF, 1.13 MB
IPFS:
,
english0